
Two similiar acrylic rods are placed in two different liquid. The one of the right is water, the one on the left is corn syrup. Why couldn't the submerged portion of the rod be seen in the jar on the left?
Will my spewed blood nourish the growing mind?
I didn't find this video funny but am rather apalled by the behaviour of both the girl and the raging teen..... I really do hope my students are way better than them, right?





Top score: 46/50.Materials
On Day 1of the competition, every team will be given the
following materials for their use:
8” Satay sticks (Pack of 180 sticks) - 5 packs
Ball string - 2 m
630 x 510 mm Vanguard sheet - 2 pcs
A4 paper - 2 pcs
4” x 5/16” Glue sticks (Pack of 12 sticks) - 1 pack
Dimensions
The bridge must span across two supports placed 600 mm apart (the width of each bridge support is 50 mm). The bridge may span straight from one support to the other. The width of the bridge must be at least 150 mm throughout the entire span. There is no limit to the height of bridge.
Judging Criteria
- Strength factor [Failure Load/(weight of bridge +
penalty weight)] 50%
- Design (Structural concept) 15%
- Construction (Workmanship) 15%
- Aesthetics & Innovation (Profile, shape and etc) 15%
- Fact Sheet 5%


Pre-Competition
We started preparing only after Common Test. I foolishly thought with 3 weeks, it should be more than sufficient to prepare for the competition.
Unfortunately, I was rudely surprised at the slow pace of work the teams are producing.
Hence I went to research and build a bridge prototype (which they are suppose to do...) to give them something to base on and to benchmark against their miserable effort. Credit of the design goes to Garret Bridges (http://www.garrettsbridges.com/design/trussdesign). So I spent half a day and created this:
Team 2 decided to follow my design with some modifications. It was strong and sturdy but was also very heavy.
Team 1 will use the design based on previous bridge competition that Kranji took part in. The design was very light but the load that it can handle is questionable...
Day 1
Both teams started at 1030 am....
and ended at 430 pm. The 6 hours might sound like a long time but both teams only barely manage to finish on time.

I heaved a huge sigh of relief...
Here the some designs from other schools:



and of course the 2 bridges from Kranji!

Day 2 - Judging
The bridges are loaded at the centre as shown. Loading will stop when the bridge breaks or the maximum load of 30 kg is reached.

Some videos of the loading for our 2 bridges. The jerkiness is due to youtube...:
Team 1
Team 2


